Zhone IMA CS-200 System Spezifikationen Seite 123

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 302
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 122
Reference Guide 3-65
System Configuration and Operation Using the Broadcast Option
Figure 3-52. Monitor Circuit Diagram
3.15.5 Split Circuit
Pressing the L command from the Menu of Actions allows you to split the circuit through
the data test center equipment. New circuit information is added in the same way as with the
monitor circuit.
With the Split Circuit, the data test center splits the circuit and connects it to their equipment.
Unlike the Monior test circuit, the Split test circuit is intrussive and all transmit and receive
data must pass through the equipment at the data test center.
Figure 3-53 shows the TADS screen with a split circuit completed. It uses two 64kbps time
slots (like the Monitor circuit). Figure 3-54 shows a diagram of the split test circuit.
Fremont DTE
Jacksonville DCE
D
ata Test Center Equip
W1-2 #1
W1-1 #1(T)
W1-2 #1
W1-1 #1(R)
W2-1 #1
W2-1 #2
Seitenansicht 122
1 2 ... 118 119 120 121 122 123 124 125 126 127 128 ... 301 302

Kommentare zu diesen Handbüchern

Keine Kommentare